24/7 emergency response, every day Emergency line: (515) 400-0302
Estimates

Des Moines Water Damage Restoration: Comparing Two Estimates

Two restoration estimates can describe different jobs. Compare extraction, materials removed, drying days, monitoring, rebuild and exclusions before the totals.

Two restoration estimates can describe different jobs under similar headings, so compare the scope before the total. Put both on the same list of stages: water removal, materials taken out, drying equipment and days, monitoring, rebuild, and exclusions. Where one estimate says nothing about a stage, treat the silence as a question for the company, not as a yes or a no. The goal is two documents you can read as the same job.

Start with one sheet of paper

Write the same stage names down the left side of a page and put each company's wording beside them. Copy the wording as written, not your reading of it. A line such as "water mitigation" can cover removal only, removal plus drying, or something else, and you cannot tell from the label.

Mark every blank. A blank is not a defect in the estimate. It is the list of things to ask before you decide, and it is easier to ask them in one message than across several calls.

Water removal and what comes out of the structure

Extraction is the physical removal of standing water and surface water. Ask each company whether the estimate includes it, and whether it covers carpet, pad, flooring and the space under them or only visible standing water. If one estimate leaves extraction out, ask whether it assumes someone else has already done it. The water extraction page explains that stage in general terms.

Then look at materials removed. Some estimates list what is coming out, such as flooring, baseboard, drywall or insulation, and some only say "demolition as needed." Ask each company:

  • Which materials are listed for removal, and in which rooms?
  • Is the list based on a moisture assessment, or is it a planning guess to be confirmed on site?
  • Who decides if more comes out later, and how are you told before it happens?
  • Who hauls away and disposes of what is removed?

If the water came from sewage or another contaminated source, ask who carries out the hazard assessment first. Do not walk into the affected space or sort through belongings to help the comparison. Your water category affects what can be dried in place and what is removed, so both companies should be working from the same category.

Drying: equipment, days and monitoring

This is where estimates look most alike and differ most. Two lines that both say "drying equipment" may hide different equipment counts, different time spans and different assumptions about how many rooms are involved. Ask each company to state the following in writing:

  • What types of equipment are planned, and for which areas?
  • How many days the estimate assumes, and what happens to the estimate if drying takes longer?
  • Whether the equipment charge is per day, per item, or a flat scope item.
  • How and when moisture is checked, and whether you receive the readings.
  • What result ends the equipment stay, and who confirms it.

Monitoring deserves its own line. A plan with scheduled checks and recorded readings is a different product from equipment set up and left until the pickup call. Ask each company to describe its own check schedule rather than assuming one. The structural drying page covers the stage in general, and an earlier post on what to ask at the progress check helps once the equipment is running.

Rebuild: included, separate or left out

Many estimates stop when the structure is dry. Others include replacement of drywall, paint, flooring or trim. A restoration estimate that ends at drying will look cheaper than one that includes rebuild, even when the two companies do the same drying work. Ask each one directly whether rebuild is part of this estimate, a separate estimate, or something they do not do.

If rebuild is separate, ask what the handoff looks like. Does the drying company give you a written record of what was removed and what was left, so a contractor can price from it? If rebuild is included, ask whether it returns each room to its prior finish or only to a basic stage such as bare framing.

Read the exclusions last. Typical items worth looking for are contents handling, mold testing, plumbing repair of the source, permit costs and after-hours charges. If an item you expected is not mentioned in either document, add it to your question list.

If either estimate brings up mold, the EPA's guidance on mold cleanup in your home is a general reference for planning questions. It does not tell you what either company will do.

Using the West Des Moines base in your questions

This site's provider is Green Home Solutions of West Des Moines (IA), and the supplied base location is West Des Moines, not Des Moines itself. Des Moines is one of the listed service areas, alongside Urbandale, Johnston, Ankeny, Grimes, Norwalk, Waukee and West Des Moines. A listed area is not a guarantee of coverage for every address, so confirm yours.

If you are comparing this provider against a company based in Des Moines, put the base location on your sheet as a plain fact and ask each company the same logistics questions. Does the estimate assume a visit to your address before it is final? Who attends, and will the person who wrote the estimate be the person who explains it? Is the estimate for work at your Des Moines address as written, and does anything in it change with location? Do not assume a travel or arrival time from either base. Ask for the company's own answer.

When you have a list of blanks, send it through the contact page with the address, the water source if known, the rooms affected and the other estimate's stage list. Check your own policy terms and your insurer's process on your own before you sign either scope, because an estimate that suits one may not suit the other.

More from the Des Moines blog

Tap to call (515) 400-0302 Trusted by Des Moines homeowners 5.0/5 · 22 Google reviews